OpenStreamUnited States
United States · New York · electricity and gas · Prices checked 24 November 2026 · re-read daily

Pure Energy Variable, 1-month minimum term, 100% renewable on Con Edison

Pure Energy Variable, 1-month minimum term, 100% renewable on Con Edison in Zone J (New York City) is posted at $0.39999 per kWh (39.999¢/kWh), a variable rate with a 1-month minimum term, the rate posted today, which can change every month after that, as posted on the Department of Public Service's Power to Choose on 2026-11-24; it ranks 41 of 41 electricity offers open there, and the cheapest fixed rate there is Chief Energy Power, LLC at 16.95¢/kWh.

OpenStream is not an ESCO, holds no registration with the New York Public Service Commission, and earns nothing from any ESCO. Every link to an ESCO is a plain hand-off. How we are paid.

The offer as posted

Posted rate
$0.39999 per kWh
Rate type
variable
Minimum term
1 month
Cancellation fee
No
Renewable share as posted
100% · Hydroelectric, Solar, Wind
Utility and zone
Con Edison in Zone J (New York City) (“ConEd in Zone J”)
The ESCO's comment
Pure Energy USA, LLC offers 100% Renewable Energy.
ESCO
Pure Energy · 866-234-8184
Where the hand-off lands
pureenergyus.com · the ESCO's own site, with any listing tag removed; we hold no referral code
Con Edison's own rates
Con Edison's rate page · as Power to Choose links it
Read
2026-11-24 (posted by the ESCO 2026-11-17), from Power to Choose

Every Pure Energy offer · Cheapest on Con Edison · All New York prices

Check your ZIP code

Which utilities and zones serve it for electricity and gas, and the ESCO offers open there.

Says which utilities and load zones serve the ZIP, as the Department of Public Service places it, and the cheapest ESCO offers open there. Your bill names your utility.